FeedProjects
Developers
Settings
🎉 A new chapter begins: Boardroom has joined Agora
Learn more
protocol logo
Explore / Projects
Index

Proposals

Discussions

Members

Information

Create Proposal

Index

ProposalsDiscussionsMembersInformation
Proposal
Back to Proposals
closedEnded 9 months ago · Snapshot (Offchain)

IIP-193: Monthly INDEX Supply Reduction Program — Treasury

By 0x5635...bb261A

Monthly INDEX Supply Reduction Program — Treasury
Category: Treasury · Tokenomics
Author: @0xdunerider Reviewers: @0xDev, @mrmadila
Date: June 10, 2025

Summary

  • Beginning July  1  2025, Index Coop will reduce the total supply of INDEX by 1.00 % (100 k INDEX) each month for three months, sourced from the IC treasury.
  • After the initial three‑month pilot period (July – September), core contributors will consult with the community and review the results before evaluating program extension into Q4 ’25.

Background

Members have asked for concrete actions demonstrating disciplined treasury management and tokenomic support. With a fixed maximum supply of 10 M INDEX, reductions to that maximum supply represent material tokenomic support.
The DAO’s long‑term plan to create value for token‑holders remains:

  1. Execute our product vision — automated re‑balancing leverage products, yield‑generating smart loops, improved distribution, and relentless focus on UI/UX to drive top‑line growth.
  2. Optimize DAO cost structure to improve operational efficiency.
  3. Return future net operating profits to INDEX holders via governance‑driven, sustainable, programmatic mechanisms.

Program Details

  1. Monthly INDEX Supply Reduction
    • 1.00 % of total supply (100,000 INDEX / month).
  2. Source
    • INDEX stored in the IC treasury multisig.
  3. Duration
    • July 1 – September 30 2025 (three consecutive monthly supply‑reduction events).
    • Post‑September, we’ll consult with the community, review the impact, and may extend for another three months.

Timeline

  • Early June 2025: Forum announcement
  • July  1  2025: First 1 % supply reduction
  • August 1 2025: Second 1 % supply reduction
  • September 1 2025: Third 1 % supply reduction
  • End of September 2025: Community consultation and program review; decide on program extension

Voting: FOR: Approve the supply reduction program

AGAINST: Reject the supply reduction program

Continue Reading
Connect Wallet to Add Note
0
Votes 13
VoterCast PowerVote & Rationale
0x03Dc...86c368
197,153

For

0x5635...bb261A
179,279

For

0xce0D...46Adac
121,422

For

0x6bf5...18aED1
70,105

For

0x5a3c...3d0B35
44,643

For

SHOW MORE
VOTE POWER
0
Connect Wallet
Proposal Status
  • Wed June 11 2025, 12:57 amVoting Period Starts
  • Sat June 14 2025, 12:57 amEnd Voting Period
Current Results

1-For

744,970.18

Quorum 744,970.18/672,600
DocumentationBrandingContact Us
Home
This Project is Currently Disabled

If you would like to enable it, please checkout below.

Boardroom Subscription

Sign up for an individual subscription (access all projects on the platform)

Subscribe
Enable Project

Enable the entire project for every user

Enable Project
Contact Us